This project consists of constructing one new elevated storage tank 2 MG (million gallons in size). There will be waterline work associated to extend the mainline to the tank site. The selected firm would be asked to provide clearing and grading services in preparation of the tank installation.
Elevated Water Tank Rehabilitation
This project involves the rehabilitation of existing elevated water storage tanks to restore structural integrity and operational efficiency. Associated work includes improvements to nearby waterlines to ensure reliable connectivity to the tanks. Site work may include clearing, grading, and other modifications necessary to support the rehabilitation activities. The goal is to extend the service life of the tanks and maintain consistent water system performance.
Elevated Water Storage Tanks Improvements
This project involves the design and construction administration for the rehabilitation of five separate elevated water storage tanks. Each tank will undergo interior and exterior recoating to extend its service life and improve corrosion resistance. The scope also includes the replacement of outdated ladder systems to enhance safety and compliance. Miscellaneous piping repairs will be completed as needed to restore functionality and improve overall system performance. The project is managed to ensure coordination, quality control, and adherence to regulatory standards throughout design and construction.
Elevated Water Storage Tanks (Cancelled)
This project consists of constructing two new elevated storage tanks. The first tank will be called the Woodlawn Tank with a size of 3 MG (million gallons). The second tank will be called the Sunset Tank with a size of 2 MG (million gallons). There will be waterline work associated to extend the mainlines to the tank site. The construction site will require grading and clearing in preparation of the tank installation.
Wilkinson Boulevard ITS Phase 2 – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Graham Street Extension Intelligent Transportation Systems
This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Sardis Road Intelligent Transportation System (ITS) – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
West Boulevard ITS – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
Sugar Creek Road ITS – CANCELLED
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.