The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.
South End Rail Trail I-277 Bridge
Contract to plan and design ped bridge over I-277
Hampton Storm Drainage Improvement Project
Storm Drainage Improvement Project
Bryant Farms Sidewalk
“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles
“
7141 Star Valley Drive Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Queens Road Phase II Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Chandworth Storm Drainage Improvement Project
Storm Drainage Improvement Project. The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Cross Charlotte Trail (XCLT)− Brandywine to Tyvola
The scope and purpose of this project is to complete the City’s 1.5-mile segment of the Cross-Charlotte Trail from the southern end of the existing greenway north of Brandywine Rd to where the County’s new segment begins on the north side of Tyvola Rd.
Rozzelles Ferry Pedscape
This project will provide new pedestrian refuge medians, new sidewalk, new wheelchair ramps, landscaping with street trees, drainage improvements, and street resurfacing. Project length is 0.706 Miles.