CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualification

Char-Meck Gov’t Center is identified in the City-wide ADA Transition Plan for Program Implementation. Project scope includes removing physical barriers identified in the ADA Transition Plan in conformance with code as applicable. Project Delivery for Phase 2 is Construction Manager at Risk (CMaR).  Vendors will be encouraged to look for contractor pre-qualification notices from our CMaR, JE Dunn Construction Company in 2026.  Scope includes Plaza Deck, 1st Floor Lobby, Mezz Level, Highrise and the adjacent parking deck.

Pennwood/Amado Storm Drainage Improvement Project

The project is located at 5430 Amado and in the Pennwood Lane Cul-de-sac and continues through the backyards to provide drainage to the channel downstream. The project involves storm drainage improvements to improve the storm drainage system in the roadway, to repair failing infrastructure and to improve drainage to the downstream channel.

Storm Water Repair and Improvement FY2026-B-PR

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Storm Water Repair and Improvement FY2026-C-PR

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Storm Water Repair and Improvement FY2026-D (Various Locations)

Work performed under this contract will consist of nine (9) storm drainage improvement projects (point repair) throughout Charlotte, NC as illustrated in the plans of the contract documents. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the respective project plan.

Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

Safe Streets for All (SS4A) – Phase 1

This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.