This project will provide new pedestrian refuge medians, new sidewalk, new wheelchair ramps, landscaping with street trees, drainage improvements, and street resurfacing. Project length is 0.706 Miles.
25th Street
The project limits are from N. Davidson to N. Brevard and will connect 25th Street over Little Sugar Creek via a bridge. It will add curb, gutter, sidewalk, planting strips, street lights, street trees, These improvements will improve accessibility for pedestrians and bicyclists, and by providing vehicular connections to the 25th Street Station.
Southpark Enhanced Crosswalks -Phase 1
This project will install new curb ramps, custom crosswalk striping, and leading pedestrian interval signals at Morrison/Sharon and Sharon/Fairview intersections
Oneida Sidewalk
This project will provide sidewalk along Oneida Road from Graham Street to Garvis Drive.
Heather/Paddock Sidewalk
This project will install a 5 ft. sidewalk and 8 ft. planting strip along Paddock Circle from Hillside Ave to Heather Lane and on Heather Lane from Paddock Circle to Park Rd.