The Valet Parking Upfit Project at Charlotte Douglas International Airport relocates the temporary valet parking location to a new permanent premium service valet parking operation and experience for the CLT passengers at the basement level of the Hourly Deck. The Valet Parking Upfit Project will include a customer transaction counter, customer waiting area, key storage room with passthrough window, employee breakroom, storage closet, four automatic glass sliding doors, paint and finishes in the Terminal and Parking Area, signage, hardware, and misc. equipment.
CMPD Animal Care and Control Compliance & ADA Renovations, Phase II
Phase II Animal Care & Control renovations will address non-compliant issues per the NC Department of Agriculture and Consumer Services, Animal Welfare Section (NCDA&CS) Inspection reports issued in 2018, 2020, and 2021. Phase II will address renovations for separation of species, inadequate ventilation surfaces not impervious to moisture, slab repair, additional square footage for dog and cat housing, and if funding is available fencing and gate replacement for dog kennels. This phase also will address ADA Barrier renovations to meet international ADA code requirements.
The facility is located at 8315 Byrum Drive, near the airport. This facility is just under 30 years old and the renovations required are a direct response to the NCDA&CS inspection reports. Also, the project will incorporate renovations to address ADA barriers in the facility, such as door hardware, signs, plumbing, minor parking lot curbing, etc.
CMPD background checks will be required for all construction staff, vendors, and anyone occupying the site during construction and deliveries.
Tuckaseegee Roundabout
This project will replace the signalized intersection of Tuckaseegee/Thrift/Berryhill with a roundabout.
Peachtree Hills Sidewalk
This project will install sidewalk within the Peachtree Hills area in three (3) locations. The proposed sidewalk will be located along Peachtree Road from Oakdale Road to Crandon Drive, along the northeast side of Beam Lake Drive from Peachtree Road to an existing sidewalk connection 800ft east, and along the south side of Oak Drive from Oakdale Road to an existing sidewalk connection 0.25 miles east.
Sidewalk Gaps and Ramps
This project will be construct various small sidewalk and ramp improvements throughout the City of Charlotte.
Ashley Road Sidewalk
This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.
South End Rail Trail I-277 Bridge
Contract to plan and design ped bridge over I-277
Bryant Farms Sidewalk
“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles
“
Cross Charlotte Trail (XCLT)− Brandywine to Tyvola
The scope and purpose of this project is to complete the City’s 1.5-mile segment of the Cross-Charlotte Trail from the southern end of the existing greenway north of Brandywine Rd to where the County’s new segment begins on the north side of Tyvola Rd.