Wood Dale Ter 2022 Storm Drainage Improvement Project

Project consists of removing a gabion wall and replacing it with a new segmental block wall.  Minimal stream impacts will be made only to install wall. Partial storm system in ROW will be removed and replaced with no outfall impacts.

2500 Briargrove Dr. Storm Drainage Improvement Project

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

718 Harwyn Dr. Storm Drainage Improvement Project

Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.

Harrisburg Road Shared Use Paths (SUPs)

Improvements on Harrisburg Road to create a more pedestrian-oriented corridor, between Ponderosa Pine Lane and Colwick Hill Road, Robinson Church Road and Timbertop Lane, and Winterwood Place and Sam Dee Road. Improvements will primarily include shared use path, drainage, curb and gutter, mid-block pedestrian crossing and milling and overlay of asphalt.

Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill

Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.

Pennwood/Amado Storm Drainage Improvement Project

The project is located at 5430 Amado and in the Pennwood Lane Cul-de-sac and continues through the backyards to provide drainage to the channel downstream. The project involves storm drainage improvements to improve the storm drainage system in the roadway, to repair failing infrastructure and to improve drainage to the downstream channel.

Storm Water Repair and Improvement FY2026-B-PR

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Storm Water Repair and Improvement FY2026-C-PR

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Storm Water Repair and Improvement FY2026-D (Various Locations)

Work performed under this contract will consist of nine (9) storm drainage improvement projects (point repair) throughout Charlotte, NC as illustrated in the plans of the contract documents. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the respective project plan.