Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.

Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Copy of 16th Street Streetscape Phase 2 – DUPLICATE PLEASE ARCHIVE

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.