Package 1 of the South Ramp Expansion Program for Charlotte Douglas International Airport (CLT or the Airport) is the first phase of construction of the overall program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. The scope of work will include but is not limited to pavement demolition, cement concrete pavement, asphalt shoulder paving, grading, drainage, erosion and sediment control, pavement markings, and airfield electrical installation.
Wilkinson Blvd. Intersection Improvements
This project will consist of roadway construction improvements in two phases/intersections. The first phase will construct new ramps to merge on and off Josh Birmingham Parkway at the eastbound lane of Wilkinson Blvd. There will also be an extension of the existing left turn lanes from the westbound side of Wilkinson Blvd. onto Josh Birmingham Pkwy. The second phase/intersection will include widening of the northbound lanes on Harlee Avenue at Wilkinson Blvd. to include two left turn lanes, one straight through lane and one right turn lane. This project consists of road widening, grading, asphalt paving, concrete curb, pavement markings, and utility coordination.
Robinson Church Road Widening – Phase 1
Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.
Vision Zero Safe to School: WT Harris at Grier
Fixing non-compliant ramps and pedestrian signals at 2 signalized intersections. Curb ramp and sidewalk replacements at multiple unsignalized intersections. Mill & overlay and pavement marking work will be required. Traffic signal wiring/conduit work will be required.
Industry Day Event: Bryant Farms Road Extension Phase 2 – Progressive Design-Build
The City of Charlotte invites interested firms to participate in an Industry Day for the Bryant Farms Road Extension Phase 2 project. This session will provide an overview of the project scope, schedule, and goals, as well as information on the City’s plan to use the Progressive Design-Build (PDB) delivery method in accordance with N.C.G.S. § 143-128.1A.
Participants will learn about:
-
-
- The City’s objectives and priorities for the project
- The anticipated procurement process and timeline
- Evaluation criteria and selection process under the PDB approach
- Opportunities for collaboration and Charlotte Business Inclusion (CBI) participation
-
A Q&A session will follow the presentation. All questions and responses will be published on the city’s procurement website to ensure transparency.
Who should attend: Design-Build firms, contractors, designers, and subcontractors interested in teaming opportunities for this project.
Event Date/Time: Monday, November 17, 2025, 10 AM to 12 PM
Event Format: In-person only
Event Location: Charlotte-Mecklenburg Government Center Room 280
About the project: The purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
Harrisburg Road Shared Use Paths (SUPs)
Improvements on Harrisburg Road to create a more pedestrian-oriented corridor, between Ponderosa Pine Lane and Colwick Hill Road, Robinson Church Road and Timbertop Lane, and Winterwood Place and Sam Dee Road. Improvements will primarily include shared use path, drainage, curb and gutter, mid-block pedestrian crossing and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill
Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
CTC Drainage Repairs
The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.
PSR # 1955