Improvements on Harrisburg Road between Winterwood Place and Sam Dee Road to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill
Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
CTC Drainage Repairs
The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.
PSR # 1955
Freeland Drainage Remediation Project
The Charlotte Area Transit System (CATS) Development division anticipates contracting out drainage improvements at the South Boulevard grade crossing near the Freeland intersection.
PSR # 1942
Pennwood/Amado Storm Drainage Improvement Project
The project is located at 5430 Amado and in the Pennwood Lane Cul-de-sac and continues through the backyards to provide drainage to the channel downstream. The project involves storm drainage improvements to improve the storm drainage system in the roadway, to repair failing infrastructure and to improve drainage to the downstream channel.
Thermal Road Culverts Storm Drainage Improvement Project
This project will replace to existing culverts that have reached the end of their serviceable lifespan at two locations along Thermal Road with new reinforced concrete pipe culverts.
Safe Streets for All (SS4A) – Phase 1
This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.
Bryant Farms Phase 2 (Design-Build)
This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.