Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.
Vision Zero Safe to School: WT Harris at Grier
Fixing non-compliant ramps and pedestrian signals at 2 signalized intersections. Curb ramp and sidewalk replacements at multiple unsignalized intersections. Mill & overlay and pavement marking work will be required. Traffic signal wiring/conduit work will be required.
Industry Day Event: Bryant Farms Road Extension Phase 2 – Progressive Design-Build
The City of Charlotte invites interested firms to participate in an Industry Day for the Bryant Farms Road Extension Phase 2 project. This session will provide an overview of the project scope, schedule, and goals, as well as information on the City’s plan to use the Progressive Design-Build (PDB) delivery method in accordance with N.C.G.S. § 143-128.1A.
Participants will learn about:
-
-
- The City’s objectives and priorities for the project
- The anticipated procurement process and timeline
- Evaluation criteria and selection process under the PDB approach
- Opportunities for collaboration and Charlotte Business Inclusion (CBI) participation
-
A Q&A session will follow the presentation. All questions and responses will be published on the city’s procurement website to ensure transparency.
Who should attend: Design-Build firms, contractors, designers, and subcontractors interested in teaming opportunities for this project.
Event Date/Time: Monday, November 17, 2025, 10 AM to 12 PM
Event Format: In-person only
Event Location: Charlotte-Mecklenburg Government Center Room 280
About the project: The purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
Harrisburg Road Shared Use Path (SUP) – Winterwood to Sam Dee
Improvements on Harrisburg Road between Winterwood Place and Sam Dee Road to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill
Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
CTC Drainage Repairs
The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.
PSR # 1955
Freeland Drainage Remediation Project
The Charlotte Area Transit System (CATS) Development division anticipates contracting out drainage improvements at the South Boulevard grade crossing near the Freeland intersection.
PSR # 1942
Pennwood/Amado Storm Drainage Improvement Project
The project is located at 5430 Amado and in the Pennwood Lane Cul-de-sac and continues through the backyards to provide drainage to the channel downstream. The project involves storm drainage improvements to improve the storm drainage system in the roadway, to repair failing infrastructure and to improve drainage to the downstream channel.