Charlotte Solar Photovoltaic (PV) Initiative – Phase 3

The project involves the design / installation of solar photovoltaic systems at the following city facilities: PHASE 3: Firehouse 18 – 2337 Dr Webber Ave. and Firehouse 33 – 2001 Mt Holly-Huntersville Rd. The solar photovoltaic systems will be installed on the roofs of each location. This project will help the city reduce its carbon emissions according to the Strategic Energy Action
Plan.

Condenser Water Loop System – Concourse E- Phase 9 – Sycamore Brewing & PDQ

The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers. Contract term 90 days.