Collective P Storm Drainage Improvement Project

The work involves various storm drainage improvements including the replacement of storm drainage pipes, curb & gutter, storm drainage structures, retaining walls, water and sewer (relocations, installations, and adjustments), and asphalt pavement. Stormwater maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.

Collective N Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Riverbend Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.

Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Rocky Falls Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Elevated Water Storage Tanks (Cancelled)

This project consists of constructing two new elevated storage tanks. The first tank will be called the Woodlawn Tank with a size of 3 MG (million gallons).    The second tank will be called the Sunset Tank with a size of 2 MG (million gallons). There will be waterline work associated to extend the mainlines to the tank site. The construction site will require grading and clearing in preparation of the tank installation.

CMGC Electric Vehicle Charging Stations Project

This project is for the purchase and installation of up to twenty-five electric vehicle charging stations for the Charlotte-Mecklenburg Government Center (CMGC) Parking Deck. Scope includes all electrical infrastructure work including but not limited to electrical panels, conduits, and concrete work.