Concrete expansion joints are cuts in concrete slabs, or the joints between walls and concrete slabs, that go completely through the slab to the base material. The purpose of an expansion joint is to allow the concrete slab to expand and contract with temperatures changes, without cracking the slab. Expansion joints must be sealed with a flexible sealant, to prevent water from penetrating the joint and deteriorating the sub-base.
PCC Spall Repair Program
The Airfield Maintenance Department of the Facilities Division of CLT maintains hard surface areas of the airfield, tenant and CLT parking areas, and private roadways on CLT property. The intent of this solicitation is to select a company to provide repairs utilizing selected construction materials for specific projects at various locations on airport property on an as needed basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Spall Repair Program
Secondary Airfield PCC Spall Repair Program
The Airfield Maintenance Department of the Facilities Division of CLT maintains hard surface areas of CLT’s airfield, and other areas as-needed. The intent of this solicitation is to select a company to provide repairs utilizing selected construction materials for specific projects at various locations on airport property on an as needed basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Spall Repair Program.
Airfield Crack Sealing Repairs
Charlotte Douglas International Airport is seeking a contractor to perform crack sealing on CLT’s airfield. The work performed on the airfield will include working on runways, taxiways, aprons, and areas around the terminal ramp.
The working hours for this project will be from 11:15 pm to 5:30 am. The contractor will be required to provide all materials, equipment, labor to install crack sealant and cleaning for the work area. The airport will furnish and install
the required barricades for this project.
Overflow Lots 1 and 2 Crack Sealing (Construction)
This project will consist of approximately 75,000 LF (not to exceed) of crack sealing in Overflow Parking, Lots 1 & 2.
The contractor will properly remove/clean vegetation and debris from cracks and hot pour crack seal in running/random cracks throughout each lot.
Heavily alligator cracked areas will be excluded in lieu of asphalt patching under separate contract. These areas will be identified on site prior to commencement of work. Cleaning and sealing of concrete at concrete/asphalt joints (at curbs and islands) are not included.
Parking Lots will be empty and clear of vehicles during this work