Charlotte Fire Station #2 – Addition and Renovations

The work consists of the addition and renovation of an existing fire station. The locker and restroom facilities will be renovated and expanded. Accessibility improvements are planned in various areas throughout the building and site.

Old City Hall – ADA Implementation

This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.

Mallard Creek Water Reclamation Facility (WRF) & Lee S. Dukes Water Treatment Plant (WTP) Standby Power & Electrical Improvements – Cancelled

The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.