The Iris Drive Storm Drainage Improvement Project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream. The estimated cost of this project is $ 521,500.00.
Catch Basins, Grates, Frames, and Hoods
The city installs and maintains road drainage structures within the right-of-way to prevent flooding and water ponding on streets. Catch basins, grates, frames, and hoods are necessary to collect runoff from the roadway
and direct it to the stormwater collection systems. The scope of this contract would be for the furnishing and delivery of catch basins, grates, frames & hoods used by the Charlotte Department of Transportation, Street Maintenance Division.