This is the third of three bid packages for the Deicing Pad, Taxiway Foxtrot Extension, and South Crossfield Taxiway (SCF) program. This project includes the concrete paving and lighting for the deicing pad, Taxiway F, and the South Crossfield Taxiway.
This is one of seven bid packages within the North End Around Taxiway Program. The construction of the Private Access Drive includes constructing approximately 3,700 feet of a two-lane roadway from the existing traffic roundabout adjacent to the Fuel Farm, along the Long Term 1 Parking Lot and Duke Energy property line and connecting to Wilkinson Boulevard with a redesigned intersection at Barry drive. This project includes utility relocations, roadway lighting, drainage, new water main and additional parking areas within Long Term 1. The purpose of this project is to construct a new access drive along the western edge of Long Term #1 parking lot to allow Long Term #1 exiting customers access to Wilkinson Blvd as well as access for terminal deliveries and Gate 80 traffic. This work will include roadway, storm drainage, traffic signal, fiber installation, parking lot, water and sewer relocation, and landscaping. The project will include work on Charlotte (CLT) owned property as well as NCDOT owned facilities. Completion of this project allows CLT Airport to take a portion of Old Dowd road out of service for North End Around Taxiway improvements.