Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
Arrowood at Whitehall Commons Intersection
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
7th Street Parallel Bike Routes (Revised 2/2026)
This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.
February 2026 Update: This project’s scope has been divided into 2 phases and will not go out for public bid; the City plans to use an established on-call contract for both phases because construction of traffic signals is required.