Central Kilborne Norland Intersection & Street Upgrade

Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.

Beatties Ford Rd. Sunset Pedestrian Improvements Phase 1

This project will improve the pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road. Project length is approximately 2.12 miles. The work includes construction of concrete sidewalk, curb & gutter, curb ramps and driveways, drainage, grading, erosion control, traffic control, asphalt pavement, pavement markings and water & sanitary sewer improvements.

Wayfinding and Signage Service

Charlotte Water, a department of the City of Charlotte, is soliciting proposals for on-call signage services to maintain and expand an established signage system for the owner’s existing and future physical locations. The Owner has established standards for interior and exterior labeling, wayfinding, emergency, and traffic flow signage needs in accordance with OSHA, ADA, fire code, and owner branding requirements. Design and materials standards are provided in a separate attachment.

The selected vendor(s) will be expected to provide comprehensive, turnkey services for any owner signage request. This may include: site/install location assessment, consultation, research, design, procurement, fabrication, assembly, delivery, installation (including any site/install location prep, utility locates, permitting, etc), repair, and/or replacement, with quality control maintained throughout the process, including the oversight of any subcontractors.

Brown Grier Road Upgrades

This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.

I-85 North Bridge (Rebid)

This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.

I-85 North Bridge

This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.

Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.