This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
Beatties Ford Rd. Sunset Pedestrian Improvements Phase 1
This project will provide pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road.
Wayfinding and Signage Service
Charlotte Water, a department of the City of Charlotte, is soliciting proposals for on-call signage services to maintain and expand an established signage system for the owner’s existing and future physical locations. The Owner has established standards for interior and exterior labeling, wayfinding, emergency, and traffic flow signage needs in accordance with OSHA, ADA, fire code, and owner branding requirements. Design and materials standards are provided in a separate attachment.
The selected vendor(s) will be expected to provide comprehensive, turnkey services for any owner signage request. This may include: site/install location assessment, consultation, research, design, procurement, fabrication, assembly, delivery, installation (including any site/install location prep, utility locates, permitting, etc), repair, and/or replacement, with quality control maintained throughout the process, including the oversight of any subcontractors.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
I-85 North Bridge
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk
This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.