Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Pineville-Matthews Road/Alexander Road Sidewalk Project

This project will add sidewalk along Hwy 51 from Echo Forest Drive (Providence High School) to Alexander Road- and sidewalk on Alexander Road between Hwy 51 and Woodshed Court. The project will also add a right turn and a second left turn lanes on Alexander Road at Hwy 51. Project length= 1.0 mile.

Flintridge Dr (2831) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

6th and Graham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Pebblestone Storm Drainage Improvement Project

Pebblestone Storm Drainage Improvement Project consist of channel stabilization and a parking lot rebuilt. The improvements will include approximately 250 linear feet of bank hard stabilization and 170 linear feet of bank soft stabilization. In addition to the channel stabilization, sanitary sewer improvements are required. 180 linear feet of 10-inch and 32 linear feet of 16-inch ductile iron restrained joint sanitary sewer pipe. 180 linear feet of 16-inch and 20 linear feet of 24-inch steel encasement pipe.