Mallard Creek NPW/PW System Rehabilitation (Re-bid)

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.

Mallard Creek NPW/PW System Rehabilitation – CANCELLED

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.

Transfer Line Materials

​This ITB is to contract with one supplier to provide materials (pipe, fittings, valves, etc.) for a transfer line project for Charlotte Water’s Engineering division. Lead time on this material is estimated to be 6 – 12 months, and the project is estimated to begin Spring 2023. The materials is needed to install a sludge transfer line between Vest and Franklin Water Treatment Plants. All materials must be purchased from one supplier to manage lead times and other important project aspects.

Water Treatment Valve Rehabilitation Services

Charlotte Water will be seeking a company to inspect Charlotte Water (Water Treatment division) valves for rehabilitation needs in order to maintain their operational status and minimize downtime.  Valves will be disconnected and reconnected by Charlotte Water.