The purpose of this contract shall be to purchase parts and supplies to repair passenger loading bridges, baggage, conveyor systems and power transmission drivers, to include those for HVAC air handlers.
Airport Main Terminal Bagroom Conveyor Upgrades
This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.