FBO Fuel Line Repairs – Phase 2

This project is a renovation at the airport’s fixed based operator (FBO) location that will modify the existing mechanical infrastructure to bring the system into compliance with NFPA code and safety standards, while also increasing flow capacity to allow for faster fueling operations.

The scope of work includes replacement of the meter and filters, replacement of the control valve with a flow-rate control system, and the addition of an overfill prevention system and relaxation chamber.

The project duration is anticipated to be approximately five months, with roughly four months allocated for shop fabrication, assembly, and submittals, followed by approximately one month for onsite installation.

FBO FUEL LINE REPAIR – Archived

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.

FBO FUEL LINE REPAIR

Remove and replace fuel lines servicing the FBO fuel cabinet, flush and abandon fuel lines that previously served

Bank of America; remove and crate two fueling cabinets; miscellaneous repairs to fuel tank farm.