The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 90KVA, 140Kva and 180Kva 400Hz Ground Power Units, 90Kva 400Hz/28Vdc Combination Units and 28Vdc Cart Mounted Ground Power Units (GPU) for the Charlotte Douglas International Airport.
1. The Contractor’s scope of work for this project will be to supply the GPU units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support, as defined within this Specification.
2. The Owner will be responsible for installation of the GPU units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (cable hoists, output cables, mounting materials and hardware) required to provide aircraft ground power from the GPU unit to the aircraft.
Pre-Conditioned Air Units
A. The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 100-ton, 90-ton, 60-ton, 45-ton, 30-ton and 20-ton Preconditioned Air Units (PCAir) for the Charlotte Douglas International Airport.1. The Contractor’s scope of work for this project will be to supply the PCAir units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support and some maintenance accessories, as defined within this Specification.
2. The Owner will be responsible for installation of the PCAir units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (hoses, adaptors, couplers, swivels, baskets, reels, straps, elbows, mounting materials and hardware) required to provide preconditioned air from the PCAir unit to the aircraft and / or PBB pre-cool plenum.
Airplane Extended Reach De-icer
The airport is interested in purchasing airplane deicers. Contract term 3 years with optional renewal years.
Airport Ground Support Equipment
The acquisition of airport ground support equipment such as aircraft tug, belt loader, stair truck and lavatory service cart. Contract term 3 years with optional renewal years.