Gold Line Phase 2 Traffic Signal Cabinets and APS Parts

The Charlotte Area Transit System is seeking to acquire Traffic Signal Cabinets, Risers and Accessible Pedestrian Signal (APS) parts for the Gold  Line Phase 2 project.   These items are required to be interchangeable and function with the existing infrastructure used by the Charlotte Department of Transportation.