Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2026-09-29 2026-09-29 Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project

Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12’x8’ CMP and replace with approx. 50 LF of 10×8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH’s and approx 30 LF of 8” DIP; 15 LF 15” PVC

Posting Number 09 2026-Q3(Jul-Sep)-CSWS-19057

Anticipated Posting Date 2026-09-29

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12’x8’ CMP and replace with approx. 50 LF of 10×8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH’s and approx 30 LF of 8” DIP; 15 LF 15” PVC

Requirements

Last Updated: 02/16/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov