Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Woodland Dr 2000 Ph 2

Details

Print Download
Add to Calendar 2026-09-15 2026-09-15 Woodland Dr 2000 Ph 2

Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12’x8’ CMP and replace with approx. 50 LF of 10×8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH’s and approx 30 LF of 8” DIP; 15 LF 15” PVC

Posting Number 09 2026-Q3(Jul-Sep)-CSWS-19057

Anticipated Posting Date 2026-09-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12’x8’ CMP and replace with approx. 50 LF of 10×8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH’s and approx 30 LF of 8” DIP; 15 LF 15” PVC

Requirements

Last Updated: 11/21/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov