charlotte-department-transportation-bluet  Charlotte Department of Transportation / Construction

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-09-01 2025-09-01 Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Posting Number 09 2025-Q3(Jul-Sep)-CDT-8628

Anticipated Posting Date 2025-09-01

Commodity Code(s): 28080, 55090, 91389, 91842, 92593, 96879

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Requirements

Last Updated: 09/20/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Donna Mash

City Contact

donna.mash@charlottenc.gov