Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Village Lake Dr 2210 Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2026-03-01 2026-03-01 Village Lake Dr 2210 Storm Drainage Improvement Project

Project started due to surface depressions along roadway. City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.

Posting Number 03 2026-Q1(Jan-Mar)-CSWS-17370

Anticipated Posting Date 2026-03-01

Commodity Code(s): 74505, 91200, 91200, 91244, 91345, 92912, 92915

Project started due to surface depressions along roadway. City plans to remove and replace corrugated metal pipe with 83 linear feet (LF) of 8’ x 4’ reinforced concrete box culvert; remove and replace two headwalls; remove and replace 311 LF of 15″ reinforced concrete pipe (RCP); remove and replace 42 LF 24″ RCP; remove and replace 27 LF 18″ RCP; bank grading; and remove and replace 85 LF 10” ductile iron pipe of sewer.

Requirements

Last Updated: 02/16/26
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov