Aviation / Construction
Terminal Basement Rehabilitation (Cancelled)
Details
Posting Number 04 2021-Q2(Apr-Jun)-AVI-3108
Anticipated Posting Date 2021-04-01
Commodity Code(s): 90900, 90910
Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1591
The Airport plans to rehabilitate the existing terminal basement as it has not been renovated since its original construction in the 1980s. The Terminal Basement currently provides three prep kitchens in addition to storage for concessionaires in the terminal. The rehabilitation will reconfigure the space to maximize the operation and update all life safety systems for this area.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!