charlotte-water-bluet  Charlotte Water / Construction

Sugar Creek Wastewater Treatment Plant Alkalinity Storage Replacement

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 03 2023-Q1(Jan-Mar)-CW-9546

Anticipated Posting Date 2023-03-21

Commodity Code(s): 91219, 91223, 91345, 91359, 91360, 91389, 91391, 91430, 91438, 91461, 93634, 96239, 98814

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/Sugar-Creek-WWTP-FY23-ITBCon-20

This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.

 

Requirements

Last Updated: 04/18/23
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov