Charlotte Water / Construction
Sugar Creek Wastewater Treatment Plant Alkalinity Storage Replacement
Details
Posting Number 03 2023-Q1(Jan-Mar)-CW-9546
Anticipated Posting Date 2023-03-21
Commodity Code(s): 91219, 91223, 91345, 91359, 91360, 91389, 91391, 91430, 91438, 91461, 93634, 96239, 98814
Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/Sugar-Creek-WWTP-FY23-ITBCon-20
This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!