Charlotte Water / Construction
Stowe Regional Water Resource Recovery Facility Southern Access Roads
Details
Posting Number 06 2021-Q2(Apr-Jun)-CW-6035
Anticipated Posting Date 2021-06-15
Commodity Code(s): 91360
Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1707
The Project is for the construction of an extension of the existing access road at the Long Creek Pump Station for operational connectivity between the proposed Stowe Regional Water Resource Recovery Facility (WRRF) and Long Creek Pump Station (Southern Access Road). The Southern Access Road consists of approximately 650 linear feet of paved roadway with 2-12 feet travel lanes and a three span approximately 235 feet long bridge that accommodates the two travel lanes and a pedestrian/utility corridor lane over Long Creek.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!