charlotte-department-transportation-bluet  Charlotte Department of Transportation / Construction

Storm Water Maintenance, Repair, and Improvement – TR2025

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-09-04 2024-09-04 Storm Water Maintenance, Repair, and Improvement – TR2025

Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.

Posting Number 09 2024-Q3(Jul-Sep)-CDT-15759

Anticipated Posting Date 2024-09-04

Commodity Code(s): 91200, 91223, 91244, 91319, 91339, 91345, 91347, 91360, 91396, 91430, 96239, 96873, 98814, 98815

Solicitation Link: https://charlottenc.bonfirehub.com/opportunities/152687

Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.

Requirements

Last Updated: 09/04/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov