charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Storm Water Maintenance, Repair, and Improvement GLFY2025-B

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-08-29 2024-08-29 Storm Water Maintenance, Repair, and Improvement GLFY2025-B

Work performed under this grouting and lining (GL) contract will consist of stormwater infrastructure maintenance, repair, and improvement projects within the city limits of Charlotte, NC. Work may be located entirely within or a combination of public right-of-way and private, residential, and commercial properties. Work includes but is not limited to the following: Grouting and lining of existing storm drainage pipe, structures or soil stabilization cleaning; maintenance/repair and installation of storm drainage pipe systems, storm drain manholes, inlets, and end treatments; channel grading, blockage/sediment removal and outfall/bank stabilization; water, and sewer relocations, installations, and adjustments, structural foundation protection and construction of sidewalks, curb and gutter, and asphalt and concrete paving associated with the specific Project Work Order (PWO).

All work will be issued in writing to the contractor via a Project Work Order. PWO’s issued through this contract may vary in size, effort, location, and monetary value. Projects could vary from $2,000 to $60,000 with project durations from 2 to 60 calendar days. These ranges are provided as a guide and are not intended to be construed as the minimum and maximum cost or duration. The Contractor will be required to furnish and maintain a minimum of 1 full-time crew to work continuously on this contract for the entire contract duration. Each crew that works must be capable of prosecuting the work listed in the Project Work Orders in accordance with section 108-1. The Contractor shall keep the city informed of their proposed work plan(s) and submit written reports of work accomplished on a frequency to be determined by the city.

The Contractor may be required to submit a written construction schedule to the city for their review and approval. Submitted Project Construction Schedules (PCS) shall be in accordance with City Standard Provision Periodic Payments.  Written reports and supporting construction documentation (survey notes, certifications, tickets, tags, etc.) shall accompany all pay requests. All work shall be subject to inspection by the City and/or their representative at any time.

Posting Number 08 2024-Q3(Jul-Sep)-CSWS-15732

Anticipated Posting Date 2024-08-29

Commodity Code(s): 91319, 91339, 91345, 91347, 91360, 96239, 98814

Solicitation Link: https://charlottenc.bonfirehub.com/projects/152197/details

Work performed under this grouting and lining (GL) contract will consist of stormwater infrastructure maintenance, repair, and improvement projects within the city limits of Charlotte, NC. Work may be located entirely within or a combination of public right-of-way and private, residential, and commercial properties. Work includes but is not limited to the following: Grouting and lining of existing storm drainage pipe, structures or soil stabilization cleaning; maintenance/repair and installation of storm drainage pipe systems, storm drain manholes, inlets, and end treatments; channel grading, blockage/sediment removal and outfall/bank stabilization; water, and sewer relocations, installations, and adjustments, structural foundation protection and construction of sidewalks, curb and gutter, and asphalt and concrete paving associated with the specific Project Work Order (PWO).

All work will be issued in writing to the contractor via a Project Work Order. PWO’s issued through this contract may vary in size, effort, location, and monetary value. Projects could vary from $2,000 to $60,000 with project durations from 2 to 60 calendar days. These ranges are provided as a guide and are not intended to be construed as the minimum and maximum cost or duration. The Contractor will be required to furnish and maintain a minimum of 1 full-time crew to work continuously on this contract for the entire contract duration. Each crew that works must be capable of prosecuting the work listed in the Project Work Orders in accordance with section 108-1. The Contractor shall keep the city informed of their proposed work plan(s) and submit written reports of work accomplished on a frequency to be determined by the city.

The Contractor may be required to submit a written construction schedule to the city for their review and approval. Submitted Project Construction Schedules (PCS) shall be in accordance with City Standard Provision Periodic Payments.  Written reports and supporting construction documentation (survey notes, certifications, tickets, tags, etc.) shall accompany all pay requests. All work shall be subject to inspection by the City and/or their representative at any time.

Requirements

Last Updated: 09/09/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov