engineering-property-management-bluet  Department of General Services / Construction

Shamrock Drive Complete Street

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-07-01 2025-07-01 Shamrock Drive Complete Street

Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.

Posting Number 07 2025-Q3(Jul-Sep)-DGS-9860

Anticipated Posting Date 2025-07-01

Commodity Code(s): 74505, 91319, 91345, 91347, 91396, 91430, 96239, 96861, 96882, 96884, 98814

Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.

Requirements

Last Updated: 10/27/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.Winebrenner@charlottenc.gov