This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

Posting Number 01 2026-Q1(Jan-Mar)-CW-17350

Anticipated Posting Date 2026-01-31

Commodity Code(s): 91200, 91345, 91359, 91360, 91389

This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

Requirements

Last Updated: 11/21/25
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov