Department of General Services / Construction
Rea Road Widening (I-485 to Williams Pond Lane)
Details
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
Posting Number 07 2025-Q3(Jul-Sep)-DGS-14168
Anticipated Posting Date 2025-07-01
Commodity Code(s): 74505, 74565, 90976, 91200, 91219, 91223, 91240, 91244, 91319, 91345, 91347, 91371, 91396, 91430, 96185, 96861, 96882, 96884, 98814, 98815
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
For Questions, Contact:
Mackenzie Winebrenner
City Contact