Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-water-bluet  Charlotte Water / Construction

Progressive Design-Build Services for Lee S. Dukes WTP Expansion

Details

Print Download
Add to Calendar 2026-03-23 2026-03-23 Progressive Design-Build Services for Lee S. Dukes WTP Expansion

This Contract is for the design and construction of the Lee S. Dukes WTP Expansion project. The first phase of this project will include the start-up of a new 18 MGD conventional treatment train and additional associated structures, processes, and appurtenances, including residuals basins, high service pumping, clearwell storage, and standby power. The Design-Builder will work with Owner and Owner’s Advisor to determine the treatment processes, final layout, sizing, and specific facilities to meet the Owner’s goals for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to: Facility Planning and Preliminary Design, Permitting, Detailed Design, Cost Estimating, Construction, Start-Up and Commissioning.

Posting Number 03 2026-Q1(Jan-Mar)-CW-19817

Anticipated Posting Date 2026-03-23

Commodity Code(s): 90900, 91200, 91300, 91400, 91842, 92500, 92517, 92535, 92592, 95826

This Contract is for the design and construction of the Lee S. Dukes WTP Expansion project. The first phase of this project will include the start-up of a new 18 MGD conventional treatment train and additional associated structures, processes, and appurtenances, including residuals basins, high service pumping, clearwell storage, and standby power. The Design-Builder will work with Owner and Owner’s Advisor to determine the treatment processes, final layout, sizing, and specific facilities to meet the Owner’s goals for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to: Facility Planning and Preliminary Design, Permitting, Detailed Design, Cost Estimating, Construction, Start-Up and Commissioning.

Requirements

Last Updated: 12/30/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov