Aviation / Commodities & Goods
A. The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 100-ton, 90-ton, 60-ton, 45-ton, 30-ton and 20-ton Preconditioned Air Units (PCAir) for the Charlotte Douglas International Airport.1. The Contractor’s scope of work for this project will be to supply the PCAir units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support and some maintenance accessories, as defined within this Specification.
2. The Owner will be responsible for installation of the PCAir units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (hoses, adaptors, couplers, swivels, baskets, reels, straps, elbows, mounting materials and hardware) required to provide preconditioned air from the PCAir unit to the aircraft and / or PBB pre-cool plenum.
Posting Number 05 2025-Q2(Apr-Jun)-AVI-17224
Anticipated Posting Date 2025-05-01
Commodity Code(s): 03523
A. The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 100-ton, 90-ton, 60-ton, 45-ton, 30-ton and 20-ton Preconditioned Air Units (PCAir) for the Charlotte Douglas International Airport.1. The Contractor’s scope of work for this project will be to supply the PCAir units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support and some maintenance accessories, as defined within this Specification.
2. The Owner will be responsible for installation of the PCAir units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (hoses, adaptors, couplers, swivels, baskets, reels, straps, elbows, mounting materials and hardware) required to provide preconditioned air from the PCAir unit to the aircraft and / or PBB pre-cool plenum.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!