aviation-bluet  Aviation / Commodities & Goods

Pre-Conditioned Air Units

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-05-01 2025-05-01 Pre-Conditioned Air Units

A. The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 100-ton, 90-ton, 60-ton, 45-ton, 30-ton and 20-ton Preconditioned Air Units (PCAir) for the Charlotte Douglas International Airport.1. The Contractor’s scope of work for this project will be to supply the PCAir units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support and some maintenance accessories, as defined within this Specification.
2. The Owner will be responsible for installation of the PCAir units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (hoses, adaptors, couplers, swivels, baskets, reels, straps, elbows, mounting materials and hardware) required to provide preconditioned air from the PCAir unit to the aircraft and / or PBB pre-cool plenum.

Posting Number 05 2025-Q2(Apr-Jun)-AVI-17224

Anticipated Posting Date 2025-05-01

Commodity Code(s): 03523

A. The Aviation Department of the City of Charlotte, North Carolina (Owner) proposes to purchase a number of new 100-ton, 90-ton, 60-ton, 45-ton, 30-ton and 20-ton Preconditioned Air Units (PCAir) for the Charlotte Douglas International Airport.1. The Contractor’s scope of work for this project will be to supply the PCAir units, factory tested and crated for storage by the Owner. The Contractor will also provide training, initial start-up support, warranty support and some maintenance accessories, as defined within this Specification.
2. The Owner will be responsible for installation of the PCAir units, including any electrical or mechanical infrastructure modifications required for the Passenger Boarding Bridge (PBB) or any electrical service upgrades required to provide the necessary power to the face of the terminal building.
3. The Owner will be responsible to procure and install the necessary accessories (hoses, adaptors, couplers, swivels, baskets, reels, straps, elbows, mounting materials and hardware) required to provide preconditioned air from the PCAir unit to the aircraft and / or PBB pre-cool plenum.

Requirements

Last Updated: 02/24/25
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Andrew Buckner

City Contact

andrew.buckner@cltairport.com