Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Charlotte Water / Construction
FY27 Large Service Contract #1

Charlotte Water / Construction
Fiscal Year 2026 Water Main Replacement
This construction contract is designated for the replacement of aging water main infrastructure. The scope of work primarily targets water mains that have reached or exceeded their expected service life and are now contributing to operational challenges such as increased maintenance, reduced reliability, and potential service interruptions. Priority is given to pipeline segments 12 inches in diameter or smaller. This contract supports Charlotte Water’s long-term asset management strategy by improving system resilience, reducing unplanned outages, and enhancing overall water service reliability.

Charlotte Water / Construction
Belmont Pump Station Construction
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Charlotte Water / Construction
Fiscal Year 2027 Small Diameter Water and Sewer Services Contract
This contract will provide installation services for small-diameter water and sewer service connections within the Charlotte Water service area. It will replace the existing FY24 Small Service Contract #2. The project ensures continued expansion and maintenance of service connections across the region.

Charlotte Storm Water Services / Construction
718 Harwyn Dr.
Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.

Charlotte Water / Construction
Sugar Creek WWTP East Equalization Basin Joint Repair
This contract will be for the rehabilitation of the east equalization basin. Construction will require the removal and replacement of deteriorating joint materials. This project will also include high pressure crack injection repairs.

Charlotte Water / Construction
Belmont Lift Station and Force Main
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Charlotte Water / Construction
McDowell Knife Gate Valve
This contract includes the replacement of IPS knife gate valves at McDowell. The work will ensure continued reliability and functionality of the infrastructure. This involves installing functioning valves for operational control within the system.

Charlotte Water / Architectural / Engineering Services
Elevated Water Tank Rehabilitation
This project involves the rehabilitation of existing elevated water storage tanks to restore structural integrity and operational efficiency. Associated work includes improvements to nearby waterlines to ensure reliable connectivity to the tanks. Site work may include clearing, grading, and other modifications necessary to support the rehabilitation activities. The goal is to extend the service life of the tanks and maintain consistent water system performance.
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.