Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Charlotte Storm Water Services / Construction
Collective AE Storm Drainage Improvement Project
Charlotte Storm Water Services / Construction
Collective AF Storm Drainage Improvement Project:
Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.
Housing & Neighborhood Services / General Services
Unspecified Demolition and Environmental Services
The City anticipates selecting one (1) or more firms for On‐Call Services to include securing structures, asbestos abatement, utility coordination/relocation, demolition, clearing and grading of specified structures and related improvements, underground storage tank, and contaminated soil removal, well abandonment, tree removal, and miscellaneous environmental remediation. Services may be planned or as a result of an emergency and do not fall within the confines of an existing project’s contract. Most demolition services are urgent in nature and required to protect the health, welfare, and safety of our residents.
Charlotte Storm Water Services / Construction
Edgewater/Rosecrest Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Charlotte Storm Water Services / Construction
Rocky Falls Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Charlotte Storm Water Services / Construction
Piccadilly Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Charlotte Storm Water Services / Construction
Severn/Tyndal Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is located in the overall Sunnyvale Storm Drainage Improvement Project (SDIP) area. The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from the Storm Water’s queue that will address seven requests for service of failing infrastructure and flooding requests. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area.
Department of General Services / Construction
Idlewild Road/Rama Road/Monroe Road Intersection
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
Collective Storm Drainage Improvement Projects Series AE will involve 3 projects throughout the City of Charlotte, 3880 Jeff Adams Dr, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 3880 Jeff Adams Dr will consist of lining approx. 562 LF 54″ CMP with CIPP. Also to include lining 12″ and 15″ systems that tie into main 54” system. We will also be doing invert repair in 54″ pipe where it has eroded. This project will need traffic control along Jeff Adams during construction and foundation protection on the permanent structure located on site. MH and DI adjustments are included in this scope along with asphalt resurfacing around them. 4440 Holbrook Dr scope will include installation of approx. 165LF 30″ RCP; 65LF 36″ RCP; 110LF 29×45 Elliptical pipe; 11LF 24″ RCP; 12LF 18″ RCP; 28LF 15″ RCP. Approx 200 LF of 30” RCP and 15” RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approx. 105LF of sewer with 8” DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approx. 75 LF of duel 60” CMP and installation of 65LF of a 10×5 RCBC. Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include conc headwalls and full depth pavement resurfacing.