/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

  • Aviation
  • Charlotte Area Transit System
  • Charlotte Communications & Marketing
  • Charlotte Department of Transportation
  • Charlotte Fire Department
  • Charlotte Mecklenburg Police Department
  • Charlotte Planning, Design & Development
  • Charlotte Storm Water Services
  • Charlotte Water
  • City Attorney’s Office
  • City Clerk
  • City Manager's Office
  • City Wide
  • Community Relations
  • Department of General Services
  • Economic Development
  • Finance
  • Housing & Neighborhood Services
  • Human Resources
  • Innovation & Technology
  • Internal Audit
  • Solid Waste Services
  • Strategy & Budget

Solicitation Category

  • Architectural / Engineering Services
  • Commodities & Goods
  • Construction
  • Construction Cost Estimating
  • General Services
  • Technology Goods & Services

Expected Release Year

  • 2019
  • 2020
  • 2021
  • 2022

Expected Release Date

  • Q1 (Jan-Mar)
  • Q2 (Apr-Jun)
  • Q3 (Jul-Sep)
  • Q4 (Oct-Dec)

Estimated Total Value

  • $10,000 - 49,999
  • $50,000 - 99,999
  • $100,000 - 249,999
  • $250,000 - 499,999
  • $500,000 - 999,999
  • $1,000,000 -4,999,999
  • $5,000,000 - 9,999,999
  • $10,000,000+
Clear

In Development

Aviation / Construction

CLT Center Storm Drainage Project

  • Posting Number: 2025-Q4(Oct-Dec)-AVI-10761
  • Anticipated Posting Date: 2025-12-01
  • Last Updated: 07/14/25
Add to Calendar 2025-12-01 2025-12-01 CLT Center Storm Drainage Project

This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC.  The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot.  The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.

In Development

Aviation / General Services

Airport Zones 2 and 3 Landscape Maintenance

  • Posting Number: 2026-Q1(Jan-Mar)-AVI-18299
  • Anticipated Posting Date: 2026-01-26
  • Last Updated: 07/14/25
Add to Calendar 2026-01-26 2026-01-26 Airport Zones 2 and 3 Landscape Maintenance

This project is to perform landscape maintenance in zones two and three within the campus of Charlotte Douglas International Airport.  Zone 2 is primarily made up of areas along Billy Graham Parkway and the airport’s parking lots.  Zone 3 is primarily made up of areas along Wallace Neal Rd., ARFF Rd., West Blvd., and Piper Lane.  The daily and weekly tasks include mowing, edging, spraying, trash pickup, pruning, and mulching. These areas are to be clean and manicured to present aesthetically pleasing appearance to the public.

In Development

Department of General Services / Construction

Monroe Road Streetscape

  • Posting Number: 2025-Q3(Jul-Sep)-DGS-8925
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 07/09/25
Add to Calendar 2025-07-01 2025-07-01 Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

In Development

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

  • Posting Number: 2027-Q2(Apr-Jun)-DGS-14020
  • Anticipated Posting Date: 2027-04-01
  • Last Updated: 07/09/25
Add to Calendar 2027-04-01 2027-04-01 Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

In Development

Department of General Services / Construction

Firehouse 44

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18355
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 06/23/25
Add to Calendar 2026-01-01 2026-01-01 Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

In Development

Charlotte Area Transit System / Construction

CTC Fare Zone Striping

  • Posting Number: 2025-Q3(Jul-Sep)-CATS-18408
  • Anticipated Posting Date: 2025-09-06
  • Last Updated: 06/23/25
Add to Calendar 2025-09-06 2025-09-06 CTC Fare Zone Striping

The Charlotte Area Transit System (CATS) anticipates contracting out the following work:

The CTC Fare Zone Striping project is a part off safety and security improvements at the Charlotte Transportation Center that will include the installation of the following approximate quantities of heated-in-place thermoplastic markings:
-950 linear feet of customized 2′-wide blue striping labeled with “FARE ZONE”;
-470 linear feet of pedestrian crosswalk (8 separate crosswalks); and
-920 linear feet of safety yellow striping for 23 bus bays.
Other additional work includes the installation of 31 yellow truncated domes, removal of existing crosswalk striping, and providing 121 linear feet of additional blue “FARE ZONE” striping to be turned over to CATS.

Heat-in-place thermoplastic will be installed per NCDOT specifications. The crosswalk and truncated dome will match the City of Charlotte Land Development Standards.

PSR # 1917

In Development

Aviation / General Services

Succession Planning Framework and Related Consulting Services

  • Posting Number: 2025-Q3(Jul-Sep)-AVI-17357
  • Anticipated Posting Date: 2025-09-05
  • Last Updated: 06/20/25
Add to Calendar 2025-09-05 2025-09-05 Succession Planning Framework and Related Consulting Services

CLT is seeking proposals from capable consultants with expertise in delivering succession planning framework and related consulting services. This initiative pertains to pivotal roles including executive, directorial, and other vital positions, where seamless and effective personnel transitions are paramount to sustain operational efficiency. Leveraging existing internal talent to bridge transitional gaps and preserving indispensable operational insights, knowledge and procedures stand as imperative objectives for CLT. We seek a consultant who can deliver a practical and comprehensive succession plan that is realistic for our business and employee population and can be adapted as needed and maintained by CLT Staff.

In Development

Charlotte Water / Construction

Environmental Services Facility HVAC Boiler Replacements

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17423
  • Anticipated Posting Date: 2025-11-14
  • Last Updated: 06/09/25
Add to Calendar 2025-11-14 2025-11-14 Environmental Services Facility HVAC Boiler Replacements

Replace three (3) HVAC boilers at Environmental Services Facility. Current units are at end-of-life. Minimum specs are: natural gas-fed at 150CFH; input 1,500,000 BTU/HR; output 1,400,000 BTU/HR; forced-draft burner on 120V/single-phase power; support communication protocols for LON, BACnet, and IoT. In addition to materials provision, awarded vendor shall perform the following tasks: verify all pipe, conduit, and wiring spec in field prior to proposal; remove and dispose of existing units; disconnect and reconnect hot water lines; disconnect and reconnect all electrical wiring; disconnect and reconnect controls; assess and add/modify any unit drainage systems; run new stainless double wall flue pipes to exterior and terminate at roof; perform combustion analysis to assure proper operation; insulate all piping; perform startup and operation check after install; and any other tasks necessary to ensure optimal operation upon completion.

In Development

Department of General Services / Construction

Safe Streets for All (SS4A) – Phase 1

  • Posting Number: 2025-Q4(Oct-Dec)-DGS-18342
  • Anticipated Posting Date: 2025-10-01
  • Last Updated: 06/09/25
Add to Calendar 2025-10-01 2025-10-01 Safe Streets for All (SS4A) – Phase 1

This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.