Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Aviation / Technology Goods & Services
CLT VoiP Migration
Charlotte Mecklenburg Police Department / General Services
CMPD Alarm Registration and Management Services
Charlotte Mecklenburg Police Department is interested in accepting proposals for the Maintenance and Management of the City’s Alarm Ordinance Program. The Program requires alarm system owners to obtain an Alarm Permit by registering their alarms (excluding auto, fire, and medical alarms). The service provider will ensure that all alarm registration and permit requirements as outlined in the City ordinance are met by alarm users, and is responsible for collecting all fines for excessive false alarms.
Department of General Services / Construction
McCullough Drive Extension
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Department of General Services / Construction
Shamrock Drive Complete Street
Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.
Charlotte Water / Architectural / Engineering Services
Franklin Water Treatment Plant Electrical Upgrades Engineering Service ... Franklin Water Treatment Plant Electrical Upgrades Engineering Services
This project provides design services to support electrical system upgrades at the Franklin Water Treatment Plant. Work includes the construction of a centralized generator building, modernization of medium and low voltage switchgear, rehabilitation of existing transfer switches, and instrumentation/control modifications. A Preliminary Engineering Report will guide the final scope of work.
Charlotte Water / General Services
Sugar Creek Gasoline and Diesel Fuel Tank Installation
This contract covers the installation of a new gas and diesel fuel tank at the Sugar Creek facility. The project will support fleet fueling operations and ensure compliance with environmental regulations. Proper installation and containment measures will be included.
Charlotte Water / General Services
McDowell Lime 2nd Structure Exterior Rehabilitation
This project involves rehabilitation of the exterior of McDowell Lime Structure 2. The work will include repairs, repainting, and other necessary maintenance to protect the structure from environmental wear. This upkeep is to ensure the longevity of the facility.
Charlotte Water / General Services
Reclaimed Water Pumping Capacity Improvements at Mallard
This contract will provide services to improve reclaimed water pumping capacity at the Mallard facility. The improvements will enhance system efficiency and support increased demand for reclaimed water usage. Upgrades will include pump replacements and infrastructure modifications.
Charlotte Water / General Services
Site Clean-Up
This contract will provide for the removal of industrial waste and debris from various Charlotte Water sites. Work may include hazardous material handling and environmental remediation as required. Proper site clean-up ensures compliance with environmental regulations and maintains safe working conditions.
The primary goal of this project is to upgrade the existing telecommunications infrastructure at the airport from copper Plain Old Telephone Service (POTS) lines to a more advanced, efficient Voice over Internet Protocol (VoIP) system. This transition is aimed at addressing the current limitations of the outdated system, which include lack of modern communication features and inefficiency in handling the airport’s operational demands.