Charlotte Water / Construction
This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism. Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.
Posting Number 09 2025-Q3(Jul-Sep)-CW-18587
Anticipated Posting Date 2025-09-12
Commodity Code(s): 91200, 91359, 91360, 92597
This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism. Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!