Department of General Services / Construction
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Posting Number 10 2025-Q4(Oct-Dec)-DGS-17950
Anticipated Posting Date 2025-10-01
Commodity Code(s): 74505, 91223, 91244, 91345, 91347, 91361, 91396, 91430, 91455, 96185, 96884, 98814
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
City Contact