charlotte-water-bluet  Charlotte Water / Construction

Mallard Water Reclamation Upgrades, Phase 1 Improvements

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 02 2021-Q1(Jan-Mar)-CW-3601

Anticipated Posting Date 2021-02-04

Commodity Code(s): 91200

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1595

The Phase 1 Water Reclamation Upgrade will increase the capacity of the facility to 14.9 million gallons per day (MGD) and includes a new deeper influent pump station to accept flow from a new, deeper trunk sewer, flow equalization, influent screens, aeration control and chemical feed.  The estimated construction cost for this upgrade is $65.2 million. The Phase 1 construction project will also include solids improvements that are estimated at $24 million.  Both aspects of the project will be delivered together as a single construction project.

Requirements

Last Updated: 02/04/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov