Charlotte Water / Construction
| This project provides increased hydraulic capacity to the Mallard Tank, which will enable it to trend better with the Huntersville Tank. This will eliminate the need to throttle inlet valve at Huntersville Tank, which will result in energy savings by reducing discharge HGLs at pump stations. It will also provide higher capacity for water to be leaked through the Mallard PRV from the 978 into the 882 in emergency scenarios. |
Posting Number 11 2025-Q4(Oct-Dec)-CW-19203
Anticipated Posting Date 2025-11-22
Commodity Code(s): 92517, 92549, 92593
| This project provides increased hydraulic capacity to the Mallard Tank, which will enable it to trend better with the Huntersville Tank. This will eliminate the need to throttle inlet valve at Huntersville Tank, which will result in energy savings by reducing discharge HGLs at pump stations. It will also provide higher capacity for water to be leaked through the Mallard PRV from the 978 into the 882 in emergency scenarios. |
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!