The scope of this project is to replace AHU-6 and AHU-49 with new AHUs. New controls, ductwork, associated VAV’s and piping will be installed as part of a complete unit replacement. Each AHU replacement will require a detailed construction phasing process to ensure limited system downtime. Temporary AHUs will be installed as needed during the equipment replacement.
Posting Number 03 2025-Q1(Jan-Mar)-AVI-17324
Anticipated Posting Date 2025-03-17
Commodity Code(s): 91036, 91450
The scope of this project is to replace AHU-6 and AHU-49 with new AHUs. New controls, ductwork, associated VAV’s and piping will be installed as part of a complete unit replacement. Each AHU replacement will require a detailed construction phasing process to ensure limited system downtime. Temporary AHUs will be installed as needed during the equipment replacement.