Work includes removing trees and vegetation from the two dams, lowering the water surface at Linda Lake Dam and cleaning and inspecting the spill way as well as making any necessary repairs to the joints of the spill way. Refreshing rip rap where needed on the dam embankments. Installing piezometers at Linda Lake, and testing the operation of the bottom drains of the two lakes.
Requirements
Last Updated: 09/08/21
Insurance Requirements+
Automobile-For automobile operations liability
Constructions Bonds-For bidding, payment, completion of construction projects
General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements+
Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Estimated Total Value+
$250,000 - 499,999
Contract Term+
Through Project Completion