Charlotte Water / Construction
Irwin Rehabilitation Improvements
Details
Posting Number 03 2021-Q1(Jan-Mar)-CW-4890
Anticipated Posting Date 2021-03-31
Commodity Code(s): 91389
Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1645
The Project consists of work in multiple process areas as follows:
- Replacement of the roof and HVAC equipment at the Administration building.
- Modifications to the existing grit removal chamber at the flow equalization facilities to include a 7-foot Parshall flume.
- Spot concrete, sealant, and pavement repairs at the flow equalization facilities.
- Installation of a third mechanical bar screen in the existing Influent Pump Station. The new mechanical screen is pre-purchased by the Owner. The Contractor will administer submittals and handle receipt, installation, startup, testing, and commissioning.
- Installation of a new eductor system on all the Influent pumps to automatically vent the pump casings.
- Modifications to the 18-inch discharge piping of two influent pumps.
- Installation of a new process analyzer (Chemscan) near the Aeration Basins. The analyzer equipment, FRP enclosure, and sample pumps are pre-purchased by the Owner. The Contractor will administer submittals and handle receipt, installation, startup, testing, and commissioning.
- Modifications to the plant’s effluent piping (42 and 30 inches in diameter) including replacement of a flowmeter vault with a new vault. The new meter will be provided by the Owner. This work will require bypass pumping.
- Replacement of the roof and select HVAC equipment at the Old Chlorine Building (Additive Alternate 1).
Requirements
Last Updated: 04/05/21
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!