Charlotte Water / Construction
This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.
Posting Number 05 2026-Q2(Apr-Jun)-CW-19830
Anticipated Posting Date 2026-05-01
Commodity Code(s): 91200, 91359, 91389, 91391
This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!