The Iris Drive Storm Drainage Improvement Project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream. The estimated cost of this project is $ 521,500.00.
Posting Number 01 2026-Q1(Jan-Mar)-CSWS-19928
Anticipated Posting Date 2026-01-20
Commodity Code(s): 89030, 91345, 92500
Solicitation Link: https://charlottenc.bonfirehub.com/opportunities/217921
The Iris Drive Storm Drainage Improvement Project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream. The estimated cost of this project is $ 521,500.00.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!