Franklin WTP 24 MOD Improvements

Details

Print Download
Add to Calendar 2026-07-01 2026-07-01 Franklin WTP 24 MOD Improvements

This project will include the installation of 39 new valves inside of the 24 MOD. The existing valves have reached their useful life. These valves have been purchased separately by Charlotte Water.

Posting Number 07 2026-Q3(Jul-Sep)-CW-19834

Anticipated Posting Date 2026-07-01

Commodity Code(s): 91200, 91360, 91389, 91392

This project will include the installation of 39 new valves inside of the 24 MOD. The existing valves have reached their useful life. These valves have been purchased separately by Charlotte Water.

Requirements

Last Updated: 12/30/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov